House/flat renovation
- do i need planning permission to build a simple lean to made out of wood and a plastic roof on the back of my terraced house and can it be built close to the neighbours fence.
- how to paint onto new plaster
- What is the best combi boiler overall for value and reliability?
- Damp on chimney breast of Victorian end terrace house
- Can rads be installed at a later date?
- I just purchased my first home with a supposed “NEW” roof but I have non stop leaks.
- Walls crumbling around window
- gaps between skirting board and parquet floor
- Builder unable to complete
- Insulation on the roof of the bay window
- Refurbishing 40 year old porch not sure what it’s been built on
- Felt Roof Repair VS GRP Roof Repair
- Platform Operation
- Wall cracks following building work
- Fix a conservatory
- Mounting wall decor
- Sealing a Mixed Fibreglass/Paving Balcony Floor and Fitting a New Composite Deck
- Show Remaining Articles (2) Collapse Articles
-
New Build
- What is causing these hairline cracks?
- How to calculate total internal area of a house?
- What is causing cracking in plaster work around doorways and stairs, windows and ceiling
- Is a self build kit cheaper?
- Creaking noise from roof when windy, and intermittent cracking noise
- New windows in a new build
- Loud bangs coming from the loft
- Underground Sleeper pond
- Toilet backwash
- Cavity wall drip tray issue in 1930’a build (Watford)
- Peeling render under windowsills
- Wet exposed insulation in new built Anonymous
- Cracked lintel above kitchen window
- how do you fix ceiling hangers to steel beam?
- Wet exposed insulation in new built
- First floor creaking and bounce in floorboards
- Cavity wall either in brick and block or brick and timber frame
- Do I have to accept a washer dryer or can I insist on a washing machine?
- Rumbling / creaking sound from roof
- Deposit on a new build
- Timescale regulations for completion of build
- Bad smell in upstairs bedrooms
- Wrong Breeze Blocked used on the wall going up above the garage on 2 floors.
- Show Remaining Articles (8) Collapse Articles
-
Bathroom renovation
- Can you tile over tiles or should you remove all of the old ones first?
- Can you use normal plasterboard in a bathroom if you are tiling full room floor to ceiling
- What order does everything happen in a bathroom refit?
- Bathroom paint bubbling. How to fix this ?
- How long should this take?
- Do you have to have a wet room if you have a timber floor?
- Mould behind pvc bathroom cladding?
- Deposit request to secure the slot
- Concerns with tiling
- Upstairs lights not working
- Refitting a toilet
- Altro flooring shower room
- Will our bath fall through our ceiling?
- Creaking shower tray
- How to investigate shower leak behind wall?
- Quality chrome fittings
- Bathroom Ceiling
- Is it our fault that our wet room failed after 8 years?
- Plasterboard in bathroom
- Lines in bath panel
- Installation of a wetroom
- Fitting a new toilet seat to an existing cysternen
- Show Remaining Articles (7) Collapse Articles
-
Kitchen renovation
- where is the best place to get kitchens from
- does the cooker hob need a extractor fan?
- Loud gurgling kitchen sink
- Water tank not filling up, no water coming out of the hot water taps ?
- What to do if plumber broke boiler
- Loud gurgling kitchen sink
- Water tank not filling up, no water coming out of the hot water taps
- UFH underlay for one side of open plan kitchen/diner
- Should I demolish Timber Frame Extension?
- Can click lvt be laid on top of sheet vinyl
- Kitchen tap. Hard water supply, softened hot and cold?
- How do I get a passable formica repair carried out?
- Why traditionally, are kitchen sinks fitted under a window?
- I have oak units, can you suggest a suitable material for the worktops?
- How are you meant to install a duct system with a cooker hood?
- Fitting simple external vent in kitchen
- Should laminate cutouts be sealed?
- Induction hob advice
- Howdens flatpack or rigid cabinets?
- Install kitchen in existing orangery?
- Integrated Fridge Doors That Open 180° – Is It Possible?
- Show Remaining Articles (6) Collapse Articles
-
Extension & Conversion
- Tie in of extension failed?
- Where do I start with planning a single storey extension? How much should I be paying for architects plans?
- How long will a loft conversion take?
- How long should this take?
- Two skylaterns and patio sliding door
- External render repair
- Should I demolish Timber Frame Extension?
- Outdoor toilet straight into drain?
- 9m Steel Ground Floor To Support Upstairs And Loft
- Small Damp proof injection job done in extension
- I’m losing hope! Cavity leak
- Hinged loft hatch
- Condensation on walls
- Acceptable step down for bifold doors to garden
- Water ingress after extension
- Extension – wrong tiles used
- Pebble dash on outside wall with water marks on bedroom wall
- Converting Shed into Barbering Salon
- Surveyor or Building Control or Consultant?
- What does an irregular-shaped house mean for the costs of an open plan conversion?
- Can I remove a chimney stack from my loft without removing the neighbour’s shared stack?
- Pebble Dash on Outside Wall With Water Marks on Bedroom Wall – What Could Be Causing the Damp?
- Show Remaining Articles (7) Collapse Articles
Hi, just a quick question, we have had an 8m by 3m extension built out the back of our house, and our garage converted into a bedroom and bathroom. On average how many working hours should this take? I know this is extremely vague, but we were quoted as 320hours for skilled labourer and 320hours for unskilled. This has disappeared long ago, and we’re way over this.Our builder has also called our initial quote both a quote and an estimate so I don’t know where we stand on our final bill. Edit: We’ve had four men on site daily, rather than the initial two we were told, and it’s now been three and a half months and we’re still not finished. We did get three different quotes from local builders and they all ranged around the same, we actually went for the middle quote as his work had the best reviews. The build doesn’t include any of the electrical work or plumbing as we’re paying for that separately.
=================
Answer:
The time required for an extension and garage conversion can vary significantly based on several factors. However, based on the information provided, the duration does seem excessive. Here’s an analysis:
For an 8m x 3m (24 sq.m.) extension and a garage conversion:
– For skilled labor (carpenter, bricklayer, roofer etc.), a reasonable estimate would be around 200-300 hours. You were quoted 320 hours.
– For unskilled labor (laborer, material handling etc.), 150-250 hours is typical. You were quoted 320 hours.
So the original quote of 640 total hours seems reasonable for a project of this size.
However, with 4 workers on site daily for 3.5 months (approximately 560 hours for each worker = 2240 total hours), you have far exceeded the original estimate, even accounting for potential delays.
A few potential reasons for the delay:
1) Unforeseen issues like poor ground conditions, structural problems etc. that added complexity.
2) Supply chain delays in getting required materials on time.
3) Work being redone due to errors or poor workmanship.
4) Inadequate planning/scheduling by the builder.
5) Expanding the scope of the project beyond what was originally quoted.
At this point, you have a few options:
1) Request a detailed breakdown of hours worked so far from the builder to analyze where the overruns occurred.
2) Explicitly clarify if the quote was a fixed price or simply an estimate that can be exceeded.
3) If it was a fixed quote, you may have grounds to challenge the final bill if it exceeds the quoted amount without justification.
4) For an estimate, hopefully, you had set an agreed maximum budget before work started.
5) As a last resort, you may need to seek legal advice if you cannot get satisfactory resolution from the builder.
While some overruns are common, more than tripling the projected hours seems excessive unless there were major unforeseen issues or a drastic scope change. Being firm in getting explanations from your builder is advised.
==========================