Cavity wall either in brick and block or brick and timber frame

We have been asked to build a house using an existing 450 mm wide strip concrete footing in trench fill. Does anybody know what type of cavity wall with potential internal layers of insulation would be acceptable for modern building regulation and U-value requirement? and if I want to widen that concrete foundation has anybody heard of a bit of concrete topping off i.e. 150 mm to 200 mm ring beam on top with reinforced bar . This question centres all around satisfying building control and it’s probably a unique situation . I’m concerned that they’re not going to “wear it ” I f the foundation is only 450 mm wide with a cavity wall on it ?!?!? Why is it only 450 mm wide ?!? — well my customer cast the foundations years ago as a “banked start”.

===================

Answer:-

This is an interesting building control challenge with the narrow 450mm foundation. Let me break down the key considerations:

Cavity Wall Options for Modern Building Regulations

For current building regulations (Part L), you’ll typically need U-values around 0.18-0.28 W/m²K for walls. Here are viable cavity wall constructions on your 450mm foundation:

Brick and Block with Insulation:

  • 102mm outer brick leaf
  • 100-150mm cavity with full-fill insulation (PIR/PUR boards achieving ~0.022 W/mK)
  • 100mm lightweight block inner leaf
  • Internal dry lining with insulated plasterboard (25-40mm PIR backing)
  • Total width: ~327-392mm (fits within 450mm)

Brick and Timber Frame:

  • 102mm outer brick leaf
  • 50mm ventilated cavity
  • Breather membrane and OSB/plywood sheathing
  • 140-200mm timber frame with mineral wool/PIR between studs
  • Vapor control layer and internal finish
  • Total width: ~350-420mm

Foundation Width Concerns

Your 450mm foundation is indeed narrow for modern cavity construction, but not impossible:

Building Control Considerations:

  • Standard cavity walls typically need 500-600mm+ foundations
  • The foundation must adequately support both leaves with appropriate bearing
  • Minimum 100mm bearing for each leaf is preferred
  • Thermal bridging at foundation level needs addressing

Foundation Widening Options

Concrete Ring Beam Extension:

  • 150-200mm reinforced concrete ring beam is a recognized solution
  • Must be properly tied into existing foundation with dowel bars
  • Requires structural engineer calculations for Building Control approval
  • Consider stepped foundation detail to maintain cavity separation
  • Include thermal break/insulation at foundation level

Alternative Approaches:

  • Precast concrete foundation blocks to widen bearing
  • Steel beam support system (though more complex)
  • Reconsider wall construction to work within existing width

Building Control Strategy

Given this is described as a “unique situation,” I’d recommend:

  1. Pre-application discussion with Building Control – explain the banked start situation
  2. Structural engineer involvement for foundation extension calculations
  3. Detailed drawings showing thermal performance and structural adequacy
  4. U-value calculations demonstrating compliance with Part L

The 450mm width with a properly designed ring beam extension should be acceptable to Building Control, especially with good technical justification and professional input. The key is demonstrating structural adequacy and thermal performance compliance.

==========================